Serbia
In the course of extensive refurbishing work for Serbia‘s largest energy suppler, Nikola Tesla, the potential to be obtained from modernisation measures became apparent. In the sector 6A of the 300 MW coal-fired power plant, the Power-teK WM 660 contributes efficiently to the best insulation.